暴雨过后,工作人员重新测定了地下车库入口的高程,以便调整排水设计。
After the heavy rain, the staff remeasured the elevation of the underground parking garage entrance so that the drainage design could be adjusted.
After the heavy rain, the staff remeasured the elevation of the underground parking garage entrance so that the drainage design could be adjusted.